It was a busy day on site today with many pieces of heavy equipment operating in close quarters. Pictured here (from left to right) an excavator placing one of the last large septic structures, another excavator with a hammer attachment (see VW-sized boulder to its left), an idle geothermal drill rig (used for holes needing deep casings) and an active drill rig finishing up the last bore hole on the east side of the Stone House.
Comments